Planning Proposal for 57-83 Church Street, Parramatta

Public exhibition - Now closed

In mid-2025, the City of Parramatta Councilpublicly exhibiteda Planning Proposal, draft Planning Agreement and draft Development Control Plan (DCP) for land at 57-83 Church Street, Parramatta.

The site has an existing Development Application approval (DA/738/2016) which was approved in 2017 and is currently under construction. The existing approval granted consent for a mixed-use development comprising residential apartments, retail and commercial space, a public plaza and a 1,953sqm public park.

The new Planning Proposal and draft Planning Agreement, seek to:

  • Increase the height of buildings and the number of apartments delivered
  • Reduce the amount of commercial floor space, from 40% commercial down to 25%
  • Dedicate a 4-storey building to Council as a Community and Cultural building with approximately 3,200sqm of floor space and 34 carparking spaces in addition to delivering a public park.

Caption: Previous approval (left) and proposed plan (right)


Public exhibition - Now closed

Thank you to everyone that had their say. Submissions closed at 5pm on Wednesday 28 May 2025. All submissions are now being reviewed ahead of a report being prepared for the Planning, Transport and Environment Committee and then consideration at a future Council Meeting. To stay updated on this project, please follow this page.

Planning Proposal changes for land at 57-83 Church Street, Parramatta

Specifically, the Planning Proposal seeks to amend the Parramatta Local Environmental Plan 2023 (LEP) as follows:

- Increase the Floor Space Ratio control from 7.2:1 to 8.4:1 for land at 83 Church Street, Parramatta (Site 1).

- Increase the Height of Buildings control from 90m to 118m (40 storeys) for land at 63 Church Street, Parramatta (Site 2).

- For Site 1 and 2, switch off the provisions within Clause 7.14 Competitive design process of the Parramatta LEP 2023 and apply the proposed Clause 7.29 (5) Site specific provisions to exempt any future application comprising of alterations and additions from the competitive design process to ensure compliance with the approved winning design excellence competition scheme.

- For Site 1, switch off Clause 7.24 Dual water systems of the Parramatta LEP 2023 and apply the proposed Clause 7.29 (6) to reflect the approval for this site which was granted before dual water systems were mandated.

- For Site 1 and 2, amend Clause 7.29 Site specific provisions to revise the non-residential (i.e. commercial, retail, restaurants and creative uses) gross floor area requirement from 40% to 25% of total gross floor area.

- To include a clause under Schedule 1 Additional permitted uses to allow residential basement carparking in the E2 Commercial Centre zone on Sites 1 and 2 and development for creative industries on Site 2.

  Existing LEP Controls Proposed LEP Controls
Zoning

Site 1 – MU1 & E2

Site 2 – MU1 & E2

Site 3 – RE1

No change
 

Maximum

Building

Height (HOB)

Site 1 – 118m

Site 2 – 90m

Site 3 – N/A

 

Site 1 – 118m

Site 2 – 118m

Site 3 – N/A

 

 

Maximum

Floor Space

Ratio (FSR)

Site 1 – 7.2:1

Site 2 – 6.4:1

Site 3 – N/A

Site 1 – 8.4:1

Site 2 – 6.4:1

Site 3 – N/A

 

Additional

Permitted

Uses

Not applicable

Permit residential basement car parking in the E2 zone (pink area)

Permit creative industries in the E2 zone

 

Draft Planning Agreement

Council has negotiated a draft Planning Agreement with the developer in accordance with Council’s Planning Agreements Policy (2018) and the Department of Planning and Environment’s Planning Agreements Practice Note – February 2021.

The draft Planning Agreement proposes to dedicate a 4-storey building to Council as a Community and Cultural building with approximately 3,200sqm of floor space and 34 carparking spaces. The Community and Cultural building will comprise retail tenancies, a community hall, commercial office space and potential use for an artists studio.

The draft Planning Agreement also proposes to replace the existing Planning Agreement, which included the following:

  • Dedicate a completed public park on Site 3 totalling approximately 1,953sqm.
  • Design and construction of footpaths and through-site links across Site 1 and 2 facilitating north-south movement between the buildings fronting Church Street and to the rear of the site.
  • Provide publicly accessible thoroughfares through the mixed-use development which will include street furniture and landscaping.

These works will be delivered in the new, proposed draft Planning Agreement.

Draft Site-Specific Development Control Plan Amendments

The existing draft Site-Specific DCP will be updated to reflect the development envisaged under this Planning Proposal. Minor amendments to the existing DCP are proposed including Figure updates, text references and diagram updates.

Please refer to the Public Exhibition documents in Resources for more detail.

Frequently asked questions

View All